The last couple of weeks, one of our parallel jobs has been to clean up the basement walls and prep it for insulating. We've glued the foam boards on, build the metal frames/studs, and are almost done filling it with insulation. Speaking of which, we've already made three insulation runs to Lowe's to date. And for anyone needing a reference, the Caravan fits 9 bags. Kel has also build the metal frame for the walls to the laundry.
Below: the before clean up, during insulating, and now.
On the right, wall tiling of our ensuite shower has begun! For anyone who watches renovation shows on TV, you'll recognize the orange membrane Kel's prepped on the walls this past weekend. Can't wait to see the finished shower!