Photo update!

Below Left: The shower in the main bathroom has been installed!
Below Right: Erica helping plaster the bathroom walls.


Below: The kitchen walls are sealed; the floor prepped for tiles.


Below Left: Kel peeking from the attic to the kitchen (through the hole he fell through last month).
Below Right: The kitchen ceiling aka the hole Kel fell through, all patched up.

No comments:

Post a Comment