Been a while since I updated the blog on our progress. The reason is we haven’t done anything dramatic lately, dad and I have been doing electrical work and there’s not a lot to show. We replaced all the wiring so all the receptacles has a grounding and we installed a couple sets of new light switches. We started to install the pot lights on the ensuite but I am unsure how it will turn out. After the first one is up, the light seems too big for the space. Anyhow, I am going over tonight and the goal tonight will be to have all the receptacles in the master bedroom and walk-in closet hooked up.
Showing posts with label day 18. Show all posts
Showing posts with label day 18. Show all posts
Day 18 to Day 24
Subscribe to:
Posts (Atom)